A fire at Radhika Apartment in Kanpur's Patkapur area on 16 November killed two people, and three days later it has turned into a citywide check on how multi-storey buildings are being put up in the old, crowded lanes. Police, the Kanpur Development Authority (KDA) and the Municipal Corporation are now preparing a joint drive, and police have drawn up a list of 63 builders whose projects will be examined.
What happened at Radhika Apartment
The six-storey building stands on a lane about five feet wide, according to local reports. The fire killed a woman and a teenage boy and left others with serious burns. Residents were treated at Ursula Hospital. The narrow approach made it hard for rescue teams and fire tenders to work.
According to PTI, a three-member committee is looking into how a six-storey building came up on a plot where permission existed for only about one-and-a-half floors. The KDA has also issued a demolition notice to the builder, asking for a reply within 15 days.
What police have done so far
An FIR was registered at Pheel Khana police station against five people, among them the builder, a plot owner and a former corporator, on a complaint by a victim's family. The Times of India reports that the FIR invokes nine sections, including cheating, and alleges that a forged KDA map was used to sell flats. Police say the allegations are being investigated and that the accused had reportedly absconded after the fire. Under Indian law, anyone named in an FIR is presumed innocent until a court decides otherwise.
The 63-builder list
According to Amar Ujala, police have prepared a list of 63 builders who put up multi-storey buildings in narrow lanes. Police Commissioner Raghubir Lal said the list has been sent to the KDA and that the campaign will be led by the KDA, with the DCP (East) acting as nodal officer from the police side.
The localities named for inspection are Chamanganj, Beconganj, Colonelganj, Hiramanpurwa, Premnagar, Deputy ka Padao, Bengali Mohal, Gillis Bazaar, Chowk and Patkapur. Besides five- and six-storey apartments, the checks will cover coaching centres, private hospitals and shopping complexes.
The commissioner said the call records of all 63 builders for the last two years will be examined to see whether land dealers, financiers and KDA staff were involved. Police sources told the paper that hawala transactions are also suspected, and the commissioner said some names on the list belong to history-sheeters and former public representatives. These are allegations at this stage; nothing has been proved.
What the inspection will look at
Amar Ujala lists nine points the joint teams will check, including:
- who owns the land and who financed the building
- whether the map was sanctioned, and which KDA staff were involved
- whether parking, lift and fire-fighting arrangements exist
- how the transformer was approved
- whether the building was ever sealed and who allowed the seal to be opened
- whether it stands on government or nazul land
- whether the basement meets rules or is being used as a workshop
PTI adds that buildings will be sorted into four risk categories, red, yellow, green and orange, depending on violations, occupancy and how easily emergency vehicles can reach them. Teams will verify sanctioned maps and fire department no-objection certificates, check exits, staircases and working fire equipment, and prepare police station-wise lists of buildings, occupants, builders and owners. Where the risk is highest, the options include evacuating residents or ordering urgent safety work.
Sealing already under way
Around 10 buildings in Patkapur, Colonelganj, Chamanganj and Beconganj have been sealed, KDA Secretary Abhay Kumar Pandey told PTI. On Tuesday, five more buildings in Chamanganj, Colonelganj and Beconganj were sealed for construction without approved maps. The Times of India reported that the KDA has also served notices on other buildings marked for sealing.
What it means for residents
For families living in these apartments, the first concrete step is to find out whether their building has a sanctioned map and a fire NOC. Buyers in congested localities should ask the builder for both documents before paying. Residents who see blocked exits or locked staircases can raise the matter with the KDA or the fire department.
What to watch next
The builder has 15 days to respond to the demolition notice. The committee's report on how the building was approved, and any action against engineers and officials, will show whether the exercise reaches beyond builders. The first red, yellow, green and orange lists will tell residents which buildings are considered most at risk.




